Qingdao Lenado Intelligent Equipment Co., Ltd. is one of the most reliable manufacturers and suppliers of mobile lng fueling station in China. With a professional production team, we are able to meet the needs of the majority of our customers. Welcome to wholesale bulk customized mobile lng fueling station from our factory.
Product Overview
The Mobile LNG Fueling Station brings LNG refueling infrastructure wherever you need it. Built on a compact, integrated skid-mounted platform, this transportable system can be rapidly deployed to temporary sites-construction zones, mining operations, remote logistics hubs, or emergency response locations-without permanent infrastructure investment.
Designed with PLC + Variable Frequency Drive (VFD) technology, the station operates in fully automatic unattended mode while maintaining the same high-performance dual-pump dispensing capability as fixed installations. The modular skid design allows seamless integration into standard 20-foot containers or flatbed trailers, enabling quick relocation as your operational needs evolve.
Whether you're supporting a 6-month mining project or providing disaster relief fueling services, this mobile solution delivers professional-grade LNG dispensing with zero civil engineering requirements-just connect power and start fueling.
Technical Specifications
|
Parameter |
TYL-2×15 Model |
TYL-2×22 Model |
|
Equipment Type |
Transportable Skid-Mounted |
Transportable Skid-Mounted |
|
Working Medium |
Liquefied Natural Gas (LNG) |
Liquefied Natural Gas (LNG) |
|
Rated Dispensing Capacity |
40m³/h |
42 m³/h |
|
Maximum Flow Rate |
340 L/ min ×2 (dual nozzle) |
350 L/ min× 2 (dual nozzle) |
|
Cryogenic Pump Power |
15 kW×2 |
22 kW×2 |
|
Total Installed Power |
~30 kW |
~44 kW |
|
Temperature-Increasing Vaporizer |
300 Nm³/h |
300 Nm³/h |
|
EAG (Emergency Air Gas) Vaporizer |
150 Nm³/h |
150 Nm³/h |
|
Control System |
PLC + VFD (Variable Frequency) |
PLC + VFD (Variable Frequency) |
|
Operation Mode |
Fully Automatic/ Unattended |
Fully Automatic/ Unattended |
|
Installation Type |
Outdoor/ Mobile-Ready |
Outdoor/ Mobile-Ready |
|
Skid Dimensions(approx.) |
3.2m×2.4m×2.6m |
3.2m×2.4m×2.6m |
|
Container Compatibility |
Standard 20ft Container |
Standard 20ft Container |
|
Pump Brand Options |
ACD/ Cryostar/ Domestic |
ACD/ Cryostar/ Domestic |
Mobile Configuration Options
Option 1: Containerized Solution
Pre-installed in 20ft ISO shipping container
Climate-controlled interior for electronics protection
Integrated lighting, ventilation, and fire suppression
Lockable security doors with access control
External dispensing hose reels mounted on container sides
Best for: Semi-permanent deployments (3-24 months), harsh environments
Option 2: Trailer-Mounted Solution
Skid mounted on heavy-duty flatbed trailer with kingpin
Road-legal dimensions for highway transport
Integrated landing gear for stable stationary operation
Quick-connect power and grounding cables
Towable by standard semi-truck
Best for: Frequent relocation (weekly/monthly moves), multi-site operations
Option 3: Skid-Only with Lifting Frame
Reinforced lifting points at four corners
Compatible with standard forklifts (≥5-ton capacity) or cranes
Can be placed on prepared concrete pad or steel platform
Most economical option
Best for: Sites with existing crane infrastructure, budget-conscious projects
Mobile-Specific Features (All Options)
✅ Quick-Connect Systems: Power cables, grounding wires, and communication lines use industrial-grade quick-connect fittings
✅ Shock & Vibration Protection: All components secured with anti-vibration mounts; sensitive electronics in reinforced enclosures
✅ Weatherproof Design: IP65-rated enclosure protects against rain, dust, and salt spray
✅ Integrated Storage: Onboard tool cabinet and spare parts locker
✅ GPS Tracking Ready: Pre-wired for fleet management telematics (optional)
Process Flow (Mobile Operation)
External LNG Storage Tank → Mobile Skid Pumps → Dual Dispensing Nozzles → Fleet Vehicles
Mobile Deployment Sequence:
Site Arrival & Setup (Day 1): Transport skid to location; position on level ground; deploy stabilizing jacks or landing gear
Utility Connection (Day 1-2): Connect to external LNG storage tank via flexible cryogenic hoses; plug into 380V power supply; install grounding rod
System Commissioning (Day 2-3): Perform safety checks; test pumps and controls; calibrate flow meters; train on-site personnel
Live Operation (Day 4+): Begin 24/7 unattended dispensing; remote monitoring via 4G/cloud platform
Demobilization (As Needed): Shutdown procedure; disconnect utilities; load onto trailer; relocate to next site
Advantages of Mobile LNG Fueling
|
Zero Civil Engineering No concrete foundations or permanent structures required Eliminates months of permitting and construction delays Avoids sunk costs in temporary infrastructure
Plug-and-Play Deployment Pre-assembled, pre-tested, and pre-wired at factory Simply connect power, LNG supply, and grounding Operational within 3 days of site arrival Follow-the-Work Mobility Relocate as mining faces advance or construction phases shift Serve multiple remote sites with one asset Avoid building redundant infrastructure at each location
CAPEX to OPEX Conversion Lower upfront capital investment vs. fixed stations Option to rent or lease mobile units for short-term projects Preserve capital for core business operations
Dual-Pump Performance-Still Mobile No compromise on dispensing speed: 340-350 L/min per nozzle Simultaneous dual-vehicle fueling even in mobile configuration Same reliability as permanent installations
Remote Monitoring & Control 4G/LTE connectivity for real-time status updates Cloud-based SCADA accessible from headquarters Automatic alerts for maintenance, low inventory, or faults
Security & Compliance Lockable enclosures prevent unauthorized access Built-in surveillance camera mounts (optional) Meets DOT, NFPA 52, and local mobile fueling regulations |
Why Mobile? The Business Case
Scenario 1: Mining Operations
Challenge: Open-pit mine with 50+ LNG-powered haul trucks. Mining face advances 500m every 6 months, making fixed fueling infrastructure impractical.
Mobile Solution: Deploy TYL-2×22 skid on trailer near current operations. Relocate twice yearly as mine expands. ROI: Avoids $500K+ in repeated civil works; reduces truck deadhead time by 60%.
Scenario 2: Infrastructure Construction
Challenge: 18-month highway construction project with 30 LNG dump trucks and excavators. Site spans 40km with no existing fuel infrastructure.
Mobile Solution: Containerized TYL-2×15 station positioned at central laydown area. ROI: Eliminates 2-hour daily detours to public stations; saves $180K/year in lost productivity.
Scenario 3: Disaster Relief & Emergency Response
Challenge: Post-earthquake or hurricane scenario requiring rapid deployment of LNG-powered generators and emergency vehicles.
Mobile Solution: Air-freight capable skid-mounted unit (disassembled) or truck-transportable container. ROI: Restores critical fueling within 48 hours; supports humanitarian operations when grid power is unavailable.
Scenario 4: Seasonal Operations
Challenge: Agricultural harvesting or logging operations run 4-6 months/year in remote areas.
Mobile Solution: Lease mobile LNG station for peak season; store or redeploy off-season. ROI: Pay only for capacity when needed; avoid year-round fixed asset costs.
Quantified Benefits
70-80% faster deployment vs. fixed station (days vs. months)
40-60% lower upfront cost (no civil works, foundations, or permanent structures)
100% asset mobility (redeploy to new revenue-generating sites)
50% reduction in vehicle deadhead time (fuel on-site vs. off-site)
Zero stranded assets (move with your business, don't abandon infrastructure)
Ideal Applications
✅ Mining & Quarrying: Open-pit mines, remote extraction sites, mineral processing camps
✅ Construction: Highway/bridge projects, dam construction, pipeline installation
✅ Oil & Gas: Well pads, fracking operations, pipeline compression stations
✅ Agriculture & Forestry: Seasonal harvesting operations, remote timber camps
✅ Emergency Services: Disaster relief, military operations, temporary events
✅ Logistics: Temporary distribution centers, seasonal freight hubs
✅ Marine & Ports: Temporary LNG bunkering during port expansion or repairs
Recommended Mobile Configurations
|
Use Case |
Model |
Mounting Option |
Pump Brand |
Rationale |
|
Frequent Relocation (monthly moves) |
TYL-2×15 |
Trailer-Mounted |
Domestic |
Lightweight, cost-effective, easy to tow |
|
Harsh Environment (dust, extreme temps) |
TYL-2×22 |
Containerized |
Cryostar |
Maximum protection + premium pump reliability |
|
High-Throughput Mining |
TYL-2×22 |
Containerized |
ACD |
Highest flow + proven durability in mining |
|
Short-Term Projects (<12 months) |
TYL-2×15 |
Skid-Only + Crane |
Domestic |
Lowest CAPEX; use existing site cranes |
|
Emergency Response |
TYL-2×15 |
Containerized |
ACD or Cryostar |
Rapid deployment + maximum reliability |
What's Included in Mobile Package
Standard Scope:
✅ Complete LNG dispensing skid (dual pumps, vaporizers, controls)
✅ Mounting structure (trailer, container, or lifting frame per selection)
✅ 20m flexible cryogenic dispensing hoses (2 sets)
✅ 50m power cable with industrial connectors
✅ Grounding rod and cable kit
✅ Operator manual and mobile deployment guide
✅ Factory acceptance test (FAT) report
✅ 12-month warranty
Optional Add-Ons
Onboard LNG storage tank (5,000-20,000L vacuum-insulated)
Diesel generator set (for off-grid operations)
Solar panel array + battery bank (hybrid power)
Card payment terminal with 4G connectivity
Remote monitoring platform (cloud-based SCADA)
Fire suppression system (dry chemical or foam)
LED lighting tower for night operations
Spare parts kit (2-year supply of seals, filters, sensors)
Ready to Deploy?
Don't let fueling infrastructure limit your operational flexibility. Our Mobile LNG Fueling Station delivers the same professional-grade performance as fixed installations-with the freedom to move when and where you need it.
Contact our Mobile Solutions Team today for:
Free site assessment and deployment planning
Customized mobile configuration quote
Rental vs. purchase cost analysis
Lead time and delivery scheduling
Typical Lead Time: 8-10 weeks from order to shipment
Deployment Support: On-site commissioning by certified technicians (optional)
Training: Remote or on-site operator training included
Power your remote operations. Protect your capital. Maintain your flexibility.
Choose Mobile LNG Fueling-where your work goes, we go.
Hot Tags: mobile LNG fueling station, China mobile LNG fueling station manufacturers, factory, L CNG Filling Skid, LNG Filling Station, LNG Refuelling Station, lng stations, LNG Truck Fueling Station, Mobile LNG Fueling Station


