Refueling Function: LNG within the storage tank is extracted and pressurized by a cryogenic pump, then dispensed into vehicles via a refueling dispenser.
Unloading Function: A cryogenic pump is used to transfer LNG from a tanker truck into the LNG storage tank.
Pressurization Function: A portion of the LNG from the storage tank is injected into a vaporizer, where it is vaporized into BOG (Boil-Off Gas) and returned to the tank; this process ceases once the tank pressure reaches the preset pressure.
Temperature Adjustment Function: The cryogenic pump extracts a portion of the LNG from the tank, passes it through a temperature conditioner, and returns it to the tank; this process ceases once the liquid temperature reaches the preset temperature.
A typical pure-LNG refueling station generally consists of the following components: an LNG storage tank, a pump skid (including a submerged pump), a tank pressurization vaporizer, an unloading vaporizer, an EAG heater (the specific configuration of these three vaporizers may vary depending on the process flow), refueling dispensers, and other ancillary equipment.
Storage Tank
Function: Used for the storage of liquid LNG.
Configuration: Vertical tanks; Horizontal tanks.
Insulation Material: Vacuum powder (Perlite);
Insulation Type: Multi-layer wrapping (Fiberglass).
Daily Evaporation Rate: < 0.3%
Maximum Design Working Pressure: 1.2 MPa
Safety Valve Opening Pressure: 1.25 MPa
Proof Pressure: < 1.6 MPa
Design Temperature: -196°C
Operating Temperature: -162°C
Precautions for Storage Tank Operation:
1. For tanks equipped with dual root valves, the valve located closest to the tank body should remain open at all times.
2. During unloading operations, it is recommended that the maximum fill level of the tank does not exceed 90% of its effective volume (manufacturers typically specify a range of 85% to 95% of the geometric volume); a minimum reserve margin of 10% must be maintained.
3. Elevated tank pressure does not necessarily indicate a fault with the tank itself; one must consider factors such as heat leakage within the overall system and the liquid retention time. Generally, if the pressure exceeds 1.1 MPa, pressure relief via venting is required; allowing the tank to remain under high pressure for extended periods can compromise the longevity of the vacuum insulation within the tank's interlayer.
4. If the tank exhibits significant, prolonged "sweating" (condensation) or frosting, accompanied by a rapid and continuous rise in pressure, it suggests a potential failure of the vacuum insulation. Emergency procedures must be initiated immediately, involving manual pressure relief and the transfer of the LNG liquid contents to another vessel. 5. It is recommended that the storage tank undergo a vacuum test once every year. For a "hot tank" (ambient temperature tank), a vacuum level of less than 1 Pa is considered acceptable; for a "cold tank" (cryogenic tank), a vacuum level of less than 0.5 Pa (0.00375 Torr) is considered acceptable.
6. The storage tank must not be transported while containing liquid. If the tank is to remain out of service for an extended period, the LNG liquid inside must be drained.
7. The storage tank is classified as a pressure vessel. In accordance with the *Safety Technical Supervision Regulations for Pressure Vessels* promulgated and implemented by the People's Republic of China, any installation, maintenance, or modification of pressure vessels must be performed by a qualified entity. This entity must notify the local quality inspection department and obtain the necessary permits before proceeding with any installation, maintenance, or modification work.
LNG Dispenser
Working Medium: LNG
Dispensing Rate: 3–80 kg/min
Metering Accuracy: Class 1.0
Repeatability: 0.5%
Working Pressure: 1.6 MPa
Design Temperature: -196°C to +55°C
Vacuum-insulated Module Design
High-brightness, large-screen display with adjustable metering units
Dual breakaway protection mechanism
Standard configuration includes vacuum-insulated dispensing hose
Optional explosion-proof receipt printer available
Metal keypad configuration
Precautions for Using the LNG Dispenser:
1. Before powering on the dispenser each time, verify that the instrument air pressure is sufficient (> 0.4 MPa).
2. Once the dispenser is powered on, the "small circulation" valve should open (unless specifically configured otherwise); the main display screen should show the data from the most recent dispensing transaction. The screen adjacent to the keypad should display "Ready to Dispense" (or "Idle").
3. "Large circulation" pre-cooling cycles should be performed as infrequently as possible. The necessity for such cycles can be determined based on the extent of frost accumulation or the ambient temperature; however, during periods of high ambient temperature, the frequency of large circulation cycles may be increased as appropriate.
4. The flow meter within the dispenser is a mass flow meter. Its physical housing is not vacuum-insulated but is instead filled with an inert gas; consequently, frost will accumulate on its exterior during prolonged operation. However, it is not recommended to apply thermal insulation to the flow meter, as doing so may compromise metering accuracy.
5. Before each operation of the dispensing nozzle (filling gun), it must be purged. Particular attention should be paid to removing any ice crystals or foreign debris from the internal sealing ring area, as such contaminants can easily damage the seal and significantly reduce its service life. 6. The sealing gasket within the fueling nozzle is highly susceptible to damage and is relatively expensive to replace. During operation, apply balanced force with both hands; first, relieve the pressure, then firmly depress the handle and withdraw the nozzle smoothly.
7. If the internal sealing gasket of the fueling nozzle is damaged, leakage will occur when the nozzle is disconnected. If leakage occurs *during* the fueling process, it typically indicates damage to the external sealing ring. The external sealing ring is more prone to damage than the internal gasket; however, a damaged internal gasket poses a significant safety risk and can easily cause injury.
8. The service life of the fueling nozzle's seals and gaskets is calculated based on the number of insertion/extraction cycles. Therefore, minimize the frequency with which the nozzle is inserted into and removed from the dispenser. When not in use, the nozzle should be placed on its designated hanging hook rather than left inserted in the dispenser's docking seat.
Pump Skid
Working Medium: LNG
Filling Rate: ≤ 160 kg/min
Working Pressure: ≤ 1.6 MPa
Design Temperature: -196°C to 55°C
Precautions for LNG Pump Skid Operation:
1. Before operating the LNG pump skid, verify that all safety bypass/vent valves are fully closed, the inlet isolation valves for the safety relief valves are in the open position, and all pneumatic valves are fully closed and set to "Automatic" mode.
2. Each section of vacuum-jacketed piping and components (such as the pump sump) on the skid is equipped with a vacuum port. It is strictly forbidden to open these vacuum ports; doing so will result in a complete loss of the vacuum insulation.
3. Certain components on the LNG pump skid only come into contact with liquid LNG under specific operating conditions; consequently, there is a potential for leakage during operation. Personnel should conduct regular visual inspections of the pump skid while it is in operation.
4. An inspection of all valves on the pump skid-including both manual and pneumatic valves-should be performed at least once per week.
5. A procedure to drain residual liquid from the vent piping should be performed once per month. This operation is strictly prohibited during thunderstorms. During the summer season, the frequency should be increased to once every 15 days, and the draining procedure should be performed immediately following any rainfall.
Cryogenic Submerged Pump
Conveying Medium: LNG
Flow Rate: 340 L/min
Motor Power: ≤ 11 kW
Rotational Speed: 1500 – 6000 rpm
Pump Sump Working Pressure: 1.6 MPa
Evaporation Rate: ≤ 50%/day
Precautions for Submerged Pump Operation:
1. When the system is running in automatic mode, the differential pressure parameters set for the pump's inlet and outlet must not be configured too low. 2. When the submerged pump is operating normally, the current displayed on the frequency converter should be greater than 4 amperes but less than 22.5 amperes.
3. In Manual Mode, when it is necessary to start the submerged pump, the pump must not be activated until the pre-cooling process is fully completed; failure to observe this precaution may result in damage to the pump or a reduction in its service life.
4. During operation, the submerged pump produces a low-level, distinct, and steady sound, while exhibiting extremely low vibration.
5. The maintenance interval for the submerged pump requires an inspection to be performed after every 4,000 hours of operation.
6. If the equipment is taken out of service for an extended period, or when maintenance is being performed on the submerged pump, the pump sump's inlet, gas return port, outlet, and other openings must be completely sealed. Subsequent operations should only be resumed once the pump sump has returned to normal conditions; this prevents air containing water vapor from entering the submerged pump, which could easily lead to ice blockages and corrosion of the pump components.