Qingdao Lenado Intelligent Equipment Co., Ltd. is one of the most reliable manufacturers and suppliers of open cng gas station in China. With a professional production team, we are able to meet the needs of the majority of our customers. Welcome to wholesale bulk customized open cng gas station from our factory.
Open CNG Gas Station | Outdoor Skid-Mounted Natural Gas Refueling Systems
Core Value Proposition
✅ Weatherproof Outdoor Enclosure | ✅ Noise Reduction <75dB @ 1m | ✅ Modular Skid Design | ✅ Quick Deployment & Easy Maintenance | ✅ ATEX/CE Certified Explosion Protection
Product Overview
Our open CNG gas station solutions deliver robust, outdoor-ready natural gas refueling systems engineered for harsh environments and rapid deployment. Featuring integrated skid-mounted compressors housed in weatherproof, sound-insulated enclosures, these stations operate reliably in temperatures from -40°C to +55°C without requiring permanent buildings or extensive civil works.
The modular box design incorporates multi-layer acoustic insulation (high-frequency absorption + low-frequency blocking), electrostatic-sprayed corrosion-resistant panels, and an integrated rainproof roof with sealed joints. All electrical components meet ExdeIIBT3/ExdIIBT4 explosion-proof standards, while the water-circulating air cooling system ensures stable operation in extreme climates using ethylene glycol antifreeze.
Ideal for mining sites, ports, construction camps, and remote fleet depots, our open CNG gas stations combine 2,500 Nm³/h compression capacity with fully automated PLC control, remote monitoring via TCP/IP, and dual-system redundancy for uninterrupted 24/7 service.
Key Advantages
1. Weatherproof Outdoor Enclosure Design
The integrated skid box features an electrostatic-sprayed exterior (after pickling, rust removal, and sandblasting) for superior corrosion resistance. Panel joints and door seams are fully sealed to prevent water ingress and noise leakage. The integrated roof design eliminates leakage risks, enabling reliable operation in rain, snow, dust, and high-humidity environments.
2. Advanced Noise Reduction <75dB @ 1m
Multi-layer sound insulation materials inside the enclosure absorb high-frequency noise and block low-frequency transmission. The frame structure minimizes panel vibration, while the self-ventilating design maintains cooling efficiency without compromising acoustic performance. Measured noise levels remain ≤75 dB(A) at 1 meter-suitable for urban, residential, and noise-sensitive locations.
3. Modular Skid Construction for Rapid Deployment
All components-hydraulic system, compression cylinders, cooling units, PLC cabinet, dispensers, and storage cascade-are pre-assembled on a single detachable skid. Connection pipelines and equipment mounts use quick-release fittings, enabling transport by truck, rail, or barge. Site preparation requires only a level concrete pad and utility connections; commissioning completes within 3-5 days.
4. Easy Maintenance Access & Serviceability
Movable access doors on all sides of the skid enclosure provide full access to compressors, filters, valves, and electrical panels without disassembly. The modular design allows individual component replacement without system shutdown. Integrated explosion-proof lighting and self-ventilation support safe nighttime or indoor maintenance.
5. Explosion-Proof Electrical Systems for Outdoor Safety
All motors, control cabinets, and junction boxes comply with ExdeIIBT3/ExdIIBT4 or ATEX standards. Cables between main motors and explosion-proof boxes route through galvanized steel pipes; other cables use plastic-clad metal hoses for vibration and corrosion resistance. Anti-surge protectors and ESD interfaces ensure coordinated emergency shutdown with station-wide safety systems.
Detailed Specifications Table
|
Parameter |
Standard Specification |
|
Model Series |
TYCZ-S / TYCB Series (Customizable) |
|
Compressed Medium |
Natural Gas (Compliant with GB18047-2000) |
|
Average Flow Rate |
1,200 – 4,500 Nm³/h (Configurable) |
|
Inlet Pressure Range |
Pipeline: 0.8–4.0 MPa / Trailer: 3–20 MPa |
|
Max Outlet Pressure |
≤25 MPa (250 bar) |
|
Compression Stages |
2–4 Stages (Depends on inlet pressure) |
|
Driving Method |
Hydraulic Reciprocating Piston |
|
Lubrication Mode |
Oil-Free (Gas Chamber) |
|
Oil Content in Gas |
<0.1 ppm (Post-compression) |
|
Main Motor Power |
2×30 kW to 2×110 kW (Per configuration) |
|
Total Power Consumption |
≤98 kW (for 2,500 Nm³/h model) |
|
Motor Speed |
1,480 r/min |
|
Cooling Method |
Water-Circulating Air Cooling |
|
Cooling Medium |
Ethylene Glycol Antifreeze / Closed Loop |
|
Control System |
Siemens PLC + Smart700 HMI + Soft Starter |
|
Explosion-Proof Grade |
ExdeIIBT3 / ExdIIBT4 / ATEX Certified |
|
Rated Voltage |
AC 380V–400V / 50Hz (60Hz Optional) |
|
Noise Level |
≤75 dB(A) @ 1 meter (Sub-station/MRU) |
|
Overall Dimensions |
4,200×2,300×2,600 mm (Skid) / 20ft Container |
|
Equipment Weight |
~6.5 – 8.5 Tons (Per configuration) |
|
Operating Temperature |
-40°C to +55°C |
Configuration Highlights
Core Compression & Hydraulic System
Compression Cylinders: DRY1000 Series Hydraulic Reciprocating Double-Force Design (Genketech Gas)
Hydraulic Pumps: Hengyuan Hydraulics 32 MPa / 1480 r/min / 160ml/r Capacity
Ex-Proof Motors: Shandong Zotye 45kW–110kW (dIIBT4 / ATEX Certified)
Soft Starters: RF-45/37K for Smooth, Grid-Friendly Motor Startup
Control & Automation
PLC Controller: Siemens S7-200Smart / CP1H-XA40D Series
HMI Touchscreen: Siemens Smart700 7" True-Color LCD
Communication: MODBUS RTU (RS485), TCP/IP, DRNET Remote Monitoring Platform
Software: Lifetime Free Upgrades, Fault Logging up to 100 Million Cycles
Safety & Monitoring
Gas Detectors: ESD100 Combustible Gas Probes (15% LEL Fan Start / 25% LEL Auto Shutdown)
Pressure/Temperature Sensors: 0–40 MPa Transmitters, Oil Level/Temp Monitoring
ESD Interface: External Emergency Stop Compatible with Station-Wide Control
Safety Valves: A21F-320C High-Pressure Relief with Manual Bypass for Maintenance
Enclosure & Environmental Protection
Frame Structure: Square Steel & Channel Steel Bolted Assembly for Rigidity
Acoustic Insulation: Multi-Layer Sound-Absorbing Materials (High-Frequency Absorption + Low-Frequency Blocking)
Surface Treatment: Pickling → Rust Removal → Sandblasting → Electrostatic Spraying
Rainproof Design: Integrated Roof with Sealed Panel Joints & Door Seams
Ventilation: Self-Ventilating Design with Explosion-Proof Lighting
Sealing & Filtration (Premium Brands)
O-Rings: Parker Fluorine Rubber (USA)
Piston & Rod Seals: SKF DR1000-QH/QG (Austria) / Parker DR1000-YG (USA)
Oil Seals: Simrit DR1000-YH (Germany)
Inlet Gas Filter: 50 μm Precision Particulate & Moisture Removal
Return Oil Filter: 10 μm Magnetic Filter for Metal Particle Capture
Dispensing & Storage Integration
CNG Dispensers: JQD-B30B(3MSW) Three-Line Dual-Hose (1–20 Nm³/min, ±1.0% Accuracy)
Mass Flow Meters: E+H 8FF15/8FF25 Stainless Steel
Storage Cascade: ZIP-270 Cylinders (1.5 m³ Water Volume @ 250 bar)
Unloading Post: CSXQZD11 Single-Hose (1–56 kg/min Flow Rate)
Break-Away Valves: ART-LOK NPT3/8 for Hose Safety
Safety & Compliance
Explosion Protection & Certification
Electrical Enclosures: ExdeIIBT3 / ExdIIBT4 per ATEX Directive 2014/34/EU
CE Marking: Compliant with EU Machinery Directive & EMC Directive
Pressure Vessels: GB 150.2-2011 / ISO 9809 / ASME Section VIII Div.1
High-Pressure Piping: 06Cr19Ni10 Stainless Steel per GB/T14976-94 / ASME B31.3
Multi-Layer Safety Logic for Outdoor Operation
Gas Detection & Ventilation: Automatic exhaust fan activation at 15% LEL, complete shutdown at 25% LEL
Weather-Resistant Electrical Design: Galvanized steel conduit for main motor cables; plastic-clad metal hoses for auxiliary wiring
ESD Integration: External emergency stop interface accepts station-wide ESD signals for coordinated power & pipeline isolation
Temperature & Level Monitoring: Automatic alarm and shutdown on abnormal oil temperature, oil level, or cooling system failure
Hydraulic Over-Pressure Protection: Relief valves prevent system pressure exceeding 315 bar
Anti-Static & Grounding: All metallic components bonded and grounded per NFPA 52
Zero Contamination Guarantee
Oil-Free Compression: Unique three-stage cylinder design with physical barrier between gas and oil chambers
No Post-Filtration Required: Gas purity maintained without downstream oil-gas separators
Seal Failure Protection: Even with complete seal degradation, oil cannot enter gas stream due to pressure differential design
Environmental Protection
Noise Reduction: Multi-layer sound insulation achieves <75 dB @ 1m, suitable for residential and urban zones
Rain & Weather Protection: Integrated roof design with sealed panel joints, IP54 enclosure rating
Zero Emissions: Closed-loop cooling system with ethylene glycol antifreeze, no wastewater discharge
Typical Applications
Mining & Remote Industrial Sites
Ideal for open-pit mines, drilling camps, and mineral processing facilities without pipeline access. The weatherproof skid design withstands dust, vibration, and extreme temperatures while delivering reliable CNG fueling for haul trucks, loaders, and support vehicles.
Port & Logistics Hub Operations
Outdoor-mounted open CNG gas stations serve container terminals, freight yards, and port vehicle fleets. Modular skid construction allows relocation as terminal layouts change; dual-hose dispensers enable simultaneous fueling of two vehicles at 1–20 Nm³/min flow rates.
Construction & Infrastructure Projects
Temporary or semi-permanent fueling for heavy equipment fleets on highway, rail, or energy projects. Rapid deployment within 48 hours of site preparation; detachable connections simplify relocation when projects complete.
Agricultural & Seasonal Operations
Support CNG-powered tractors, harvesters, and transport vehicles during peak seasons. The enclosed skid design protects equipment from field dust, moisture, and temperature swings while maintaining <75 dB noise levels near residential farmland.
Emergency & Disaster Response
Deployable fueling units for emergency services, military operations, or humanitarian relief. Weatherproof enclosure ensures operation in rain, snow, or high-wind conditions; integrated storage cascade reduces dependency on continuous trailer supply.
Urban Fleet Depots with Space Constraints
Compact skid footprint (4.35×2.3×2.65 m) fits constrained urban sites where permanent buildings are impractical. Noise reduction and weatherproofing enable installation near residential zones without special permits.
After-Sales & Support
Warranty Coverage
Standard Warranty: 12 months from commissioning or 2 months from delivery (whichever occurs first). Extended 24-month warranty available for containerized models.
Coverage: Manufacturing defects in compressors, PLC systems, hydraulic components, enclosure structure, and weatherproofing elements.
Exclusions: Normal wear items (seals, filters, O-rings), improper operation, force majeure events.
Included Spare Parts Package
Each unit ships with comprehensive spare parts kit:
Solenoid valves (medium pressure) × 1 set
Pressure transmitters (0–40 MPa) × 1 set
Circuit breakers (various ratings) × 6 units
Contactors (GMC-9, GMD-25) × 2 units
Relays × 2 units
O-rings (rubber) × 30 pieces
Check valves × 4 units
Analog I/O panels × 2 units
Operating handles × 1 set
Commissioning & Training
On-Site Commissioning: Certified engineers travel to your location for installation supervision, system testing, and performance validation in outdoor conditions
Operator Training: 3-day comprehensive training covering PLC operation, safety procedures, routine maintenance, and troubleshooting in open-air environments
Documentation: Complete operation manuals, electrical schematics, P&ID diagrams, and maintenance schedules in English
Preventive Maintenance Schedule for Outdoor Units
|
Component |
3 Months |
6 Months |
1 Year |
2 Years |
3 Years |
|
Oil Return Filter |
Inspect |
Replace |
Replace |
Replace |
Replace |
|
Gas Inlet Filter |
Inspect |
Inspect |
Replace |
Replace |
Replace |
|
Antifreeze Fluid |
Check Level |
Test Concentration |
Replace |
Replace |
Replace |
|
Hydraulic Oil |
Check Level |
Inspect Quality |
Replace |
Replace |
Replace |
|
Air Cooler Fins |
Clean |
Clean |
Inspect |
Inspect |
Inspect |
|
Enclosure Seals |
Inspect |
Inspect |
Inspect |
Replace |
Replace |
|
Electrical Conduit |
Visual Check |
Visual Check |
Visual Check |
Inspect |
Inspect |
Remote Support & Software
24/7 Remote Monitoring: DRNET software enables real-time performance tracking, fault diagnosis, and predictive maintenance alerts via internet connection
Free Lifetime Software Upgrades: PLC control software, HMI interface, and communication protocols updated at no charge
Technical Hotline: Email and phone support with 24-hour response time for critical issues
Video Troubleshooting: Remote video calls with engineers for complex diagnostic procedures in field conditions
Customization Services for Open-Air Deployment
Climate Packages: Arctic (-40°C) or tropical (+55°C) operating temperature configurations with enhanced antifreeze and cooling capacity
Enhanced Enclosure Options: Additional insulation, heating elements, or HVAC integration for extreme environments
Corrosion Protection: Marine-grade coatings or stainless steel upgrades for coastal/port installations
Noise Reduction Upgrades: Additional acoustic layers or vibration isolators for ultra-quiet urban deployments
Lighting & Safety Add-Ons: Explosion-proof work lights, emergency egress signage, or fire suppression integration
Hot Tags: open CNG gas station, China open CNG gas station manufacturers, factory


